Phase 6: Cleanup & Push¶
Home > Document-Driven Development > Phases > Phase 6
Remove temporary files, verify completeness, push changes
Goal¶
Clean up temporary artifacts, perform final verification, and push clean, complete work to remote.
The Steps¶
Step 1: Cleanup Temporary Files¶
# Remove file crawling indexes
rm /tmp/docs_checklist.txt
rm /tmp/docs_to_process.txt
rm /tmp/code_to_implement.txt
rm /tmp/test_checklist.txt
# Review ai_working/ directory
ls -la ai_working/
# Archive valuable reports
mkdir -p ai_working/archive/$(date +%Y-%m-%d)-feature-name
mv ai_working/user_testing_report.md ai_working/archive/.../
# Delete pure working files
rm ai_working/implementation_tracking.md
Generally: Don't commit ai_working/ unless files are broadly valuable.
Step 2: Final Verification¶
Before pushing:
- All todos complete
- All tests passing:
make test - All checks passing:
make check - Documentation and code in perfect sync
- No temporary/debug code
- No debugging print() statements
- Commit messages clear
- No uncommitted changes:
git statusclean - Philosophy principles followed
Philosophy verification:
## IMPLEMENTATION_PHILOSOPHY.md
- ✅ Ruthless simplicity
- ✅ Minimal implementation
- ✅ Clear over clever
## MODULAR_DESIGN_PHILOSOPHY.md
- ✅ Bricks and studs (clear interfaces)
- ✅ Regeneratable from spec
- ✅ Self-contained modules
Step 3: Push Changes¶
# Review all commits
git log origin/main..HEAD --oneline
# Verify branch
git branch --show-current
# Push
git push origin <branch-name>
PR Description Template¶
If pushing triggers PR creation:
# [Feature Name]
## Summary
Implements [feature] as specified in documentation.
## Documentation
- [docs/USER_ONBOARDING.md](link) - User guide
- [docs/API.md](link) - Technical reference
- [README.md](link) - Quick start updated
## Implementation
- Added [key components]
- Updated [modified areas]
- Comprehensive tests
## Testing
### Code Tests
- ✅ Unit tests: 45 tests, 100% coverage
- ✅ Integration tests: End-to-end verified
- ✅ All checks passing
### User Testing (AI QA)
- ✅ Tested 3 main scenarios as actual user
- ✅ Smoke tested integration points
- ✅ 1 critical issue found and fixed
- ✅ Report: ai_working/archive/.../user_testing_report.md
### Recommended Human Verification (~12 minutes)
- Fresh setup flow
- Provider switching
- Error handling
## Philosophy Compliance
- ✅ Ruthless simplicity
- ✅ Modular design
- ✅ Documentation-driven
- ✅ Context-poison-free
## Breaking Changes
None - additive functionality
Output of Phase 6¶
When complete:
- ✅ Temporary files cleaned
- ✅ Final verification complete
- ✅ All tests and checks passing
- ✅ Documentation and code in perfect sync
- ✅ Clean git history
- ✅ Pushed to remote
- ✅ Ready for human review
DDD Cycle Complete!
Return to: Phases | Main Index
Prerequisites: Phase 5: Testing & Verification